Diaspora construction portal

An owner abroad follows their build in their own language — voice notes and photos become an organized, translated progress report — and money is released only for milestones the local site manager has verified.

Read the full idea page →
Who is using it

A diaspora owner in Zürich whose family house is being built in Prishtina, following progress in Albanian while the site team works in Albanian and German.

What started the workflow

The site manager uploads a voice note and photos after finishing the ground-floor walls; that evening the owner opens the portal.

  1. Site manager uploads evidenceHuman

    From the site, the manager records a short voice note in Albanian and adds photos of the finished walls.

    • Voice note (SQ, 0:48)
    • 6 photos: ground-floor walls, all elevations
  2. Transcribe, translate & organizeAIAI confidence 84%

    The Albanian voice note is transcribed and translated to the owner’s language, and the photos are filed by building, floor, room and phase.

    • Transcript (SQ) → translated to DE/EN for the owner
    • Photos organized: Ground floor · walls · phase 2
    • Summary: “Ground-floor walls complete; ready for inspection.”
  3. Progress & risk extractionAIAI confidence 79%

    Completed work is summarized and any risks or missing evidence are surfaced for attention.

    UncertainThe manager mentioned a possible plumbing rough-in delay — flagged for the owner, not treated as confirmed.

  4. Owner reads the report — in AlbanianHuman

    The owner sees a clear progress report and photo set in their own language, including the flagged risk.

  5. Payment guardBusiness rule

    The owner taps “release” for the walls milestone, but it isn’t site-verified yet, so the guard blocks it.

    UncertainRelease requested before site-manager sign-off.

    Deterministic checkDeterministic: a milestone is “verified” only with site-manager sign-off + required photos. Payment release is blocked unless verified = true.

  6. Site manager signs offHuman

    Prompted by the owner’s message, the local manager confirms the walls are complete, flipping the milestone to verified.

  7. Owner releases the verified milestoneHuman

    Now that the milestone is independently verified, the owner authorizes the payment.

    The milestone is now site-verified. Release €12,000 for “ground-floor walls”?

  8. Ledger & dashboard updateSystem

    The payment is recorded, the budget bar advances, the next milestone opens, and both parties are notified in their own language.

    • Payment recorded (€12,000)
    • Budget released: 43% of plan
    • Next milestone opened: roof structure